AI Launch Lab
Sign in FR Get updates

Project kit

Planning schedules, routes and shifts

Build the weekly plan in minutes instead of hours, and make it fairer and cheaper.

All kits · Run this kit with us

It fits when

  • Someone builds schedules, routes or production plans by hand each week
  • The rules are known (availability, skills, time windows, capacity), even if unwritten
  • Last-minute changes are common and painful

It’s not the right kit for

  • Plans that change completely every day with no pattern
  • Decisions that are mostly negotiation between people

Data checklist

  • A few past schedules or routes, and what made them good or bad
  • The rules and preferences, written down with the person who plans
  • Availability, locations or capacities in a spreadsheet

Privacy checklist

  • Employee availability and addresses are personal information: use only what the plan needs, with codes instead of names where possible
  • Sign the project agreement before any data is shared
  • Share only the data the project needs, and remove names and personal details where possible
  • Keep data in tools the business has approved; don’t paste it into public AI tools
  • Return or delete the data at the end, and confirm it in writing

Team

Twelve-week plan

  1. Weeks 1–2Scope

    Sit with the planner, write down every rule and preference, and pick what to optimize (cost, time, fairness).

  2. Weeks 3–4Data

    Put the inputs in one clean spreadsheet and rebuild a past week by hand in the new format.

  3. Weeks 5–8Build

    Build a solver that proposes a plan from the spreadsheet, and lets the planner lock choices and re-run.

  4. Weeks 9–10Test with staff

    Plan real weeks with it alongside the usual method; compare time, cost and rule violations.

  5. Weeks 11–12Hand over

    Document the rules in plain language, show the planner how to change them, and recommend next steps.

Deliverables

  • A planning tool that works from a spreadsheet
  • The rules, written down in plain language
  • Trial results: time to plan, cost and rule violations
  • A recommendation: build, buy or stop

How to measure success

  • Hours a week spent planning
  • Cost or distance of the plan
  • Rule violations and last-minute changes

Notes for mentors

  • Writing the rules down is half the value: don’t rush it
  • The planner must be able to override anything
  • Prefer a simple solver the business can run over a clever one it can’t

Common risks

  • Unwritten rules surface late: test on real weeks early
  • The planner feels replaced: involve them as the expert from day one

AI Launch Lab · Creative Commons BY-NC-SA 4.0 · launchlab.ai/kits/